• Square D Powerlink G3 by Schneider Electric

    This intelligent lighting control system can be a critical cog in a demand-response strategy by dimming or turning off pre-selected lighting loads when necessary.
    Feb. 22, 2010

    A Square D Powerlink G3 intelligent lighting control system can be a critical cog in a demand-response strategy by dimming or turning off pre-selected lighting loads when necessary, helping commercial building managers better control operating costs. Seamless to retrofit into an existing building and integrate within a building automation system, a Square D Powerlink G3 intelligent lighting control system can quickly react to potential load-shed situations, such as market electrical prices reaching a pre-determined ceiling that prompts a shift to back-up power sources. A Square D Powerlink G3 intelligent lighting control system also can be used to configure and execute a load-shed sequence remotely, increasing convenience for facility managers.

    Square D Powerlink G3 intelligent lighting control panelboards contain a schedule-based controller that can be configured to include a load-shed lighting sequence that activates based on a command from the building automation system, facility manager, or even directly from the utility.

    Sign up for our Newsletter
    Get the latest news and updates.

    Voice Your Opinion!

    To join the conversation, and become an exclusive member of I+S Design, create an account today!